Check the waterway and circuit before turning on the machine. The boot sequence is:
① Turn on the incoming power and turn on the key switch. At this time, the ventilation and cooling system of the machine is energized, and the ammeter shows a value of about 7A;
② Wait for 5 to 10 seconds, press the trigger button on the external control panel, the ammeter shows a value of zero, after 3 to 5 seconds, the krypton lamp is lit, and the ammeter shows a value of 7A. (Refer to the laser power supply operation manual);
③ Turn on the power of the galvanometer;
④ Turn on the computer and call up the required marking file;
⑤ Adjust the laser power to the working current (10~18A), and then start marking.
After marking, turn off the power of each component in reverse in the above order:
① Adjust the working current of the laser power supply to the minimum (about 7A);
② Turn off the computer;
③ Turn off the power of the galvanometer;
④ Press the stop button;
⑤ Turn off the key switch;
⑥ Disconnect the incoming power.





